Valio, Lapinlahti

Utilization of waste heat from the boiler (150 C°) with a flue gas scrubber utilizing a heat pump. The heat is utilized in the factory’s heating network (80 C°), which serves both the property and the process sites. The package also includes energy storage and the possibility to utilize heat flexibly.

Elomatic’s role

  • Pre-study
  • Engineering
  • Procurements
  • Operations
  • Project management

Contact us

Heikki Nieminen

Sales Manager

+358 40 3532 005 heikki.nieminen@elomatic.com